Drinking Water Pipeline Cleaning
A deliberately difficult 6-inch bitumen / coal-tar-lined cast-iron main that had remained stagnant for more than 20 years.
View Drinking Water TrialA deliberately difficult 6-inch bitumen / coal-tar-lined cast-iron main that had remained stagnant for more than 20 years.
View Drinking Water TrialWastewater network development focused on mobilising accumulated solids and demonstrating controlled deployment and recovery.
View Rising Main Case Study